Power
Where Mission
Demands It.

Containerized solar + battery systems engineered to deliver silent, autonomous power to forward operating bases, energy-critical industries, and the American jobsite. Deploy in under an hour. Run for years. Burn no fuel.

<60m Deploy → Power
110kW Solar / Container
24/7 Autonomous
<80dB Silent Op.
Scroll
The Systems

Four Platforms.
One Operational Truth.

Pre-configured, factory-tested, plug-and-play. From a 1,500 lb towable trailer to a 24-foot expeditionary container, every system arrives mission-ready.

Flagship Nomad Energy Box 20
20-foot Hybrid · ISO Container

Nomad Energy Box 20

Our flagship expeditionary platform. A standard 20-foot ISO container that unfolds into a 110 kWp solar array with 122 kWh of onboard battery.

110kWpSolar
122kWhBattery
100kWNominal
Defense-Tested Nomad Energy Box 10
10-foot Hybrid · Air-Transportable

Nomad Energy Box 10

The expeditionary hero. A 10-foot hardened container engineered for rapid air-deploy, proven at the BACSI defense exercise. Set up in under an hour by two operators.

47.6kWpSolar
61kWhBattery
<1hrSetup
Towable Nomad Energy Tow
Towable Trailer · 30-Minute Deploy

Nomad Energy Tow

1,500 lbs of mobile power. Hitch to any vehicle, drive to the site, deploy in thirty minutes. Built for special operations and high-mobility tactical use.

12kWpSolar
20kWhBattery
30minSetup
Humanitarian Nomad Energy Water
Solar + Atmospheric Water

Nomad Energy Water

The only mobile system that generates drinking water from air, powered entirely by sun. 264 gallons per day. No grid. No fuel. No chemicals.

54.7kWpSolar
264galWater
100%Auto
Department of War

The Quietest Generator
You'll Never Hear.

Fuel convoys are casualty magnets. Diesel signatures give you up. Our containerized systems eliminate the fuel chain, the noise, and the heat plume — and replace them with autonomous, hybrid power that runs through the night.

0 Fuel Convoys
$1.2M+ FOB Fuel Savings / Yr
<1hr Combat Deploy
Read the Defense Brief
The Number That Matters 90%
Diesel Displacement at FOB-Scale Pilot Operations
Request a Brief

Tell Us the Mission.
We'll Bring the Power.

Every brief gets an engineering review and a clear path to deploy — typically within one business day.

Request the Brief
HQDallas, TX
Directrturpin@nomadamerica.energy
ProcurementGSA · DLA · FAR Pathways