Skip to content
Nomad Energy Tow trailer with panels unfolding

Solar Generators for Film and Events Quiet Power
for Set and Stage

Solar and battery power for film sets, festivals, and broadcast compounds. No engine noise near the mics, no exhaust drifting into base camp or the crowd, and no refuel in the middle of the show. Request a brief for your next production.

30min Typical Deploy / Tow
61kWh Battery / Box 10 Hybrid
50kW Inverter / Box 10
The Diesel Problem

Generators Don't
Belong Near the Shot

Every production fights its generator. It has to be parked far enough from set to keep the sound mixer happy, close enough to run cable, and fueled on a schedule that never lines up with the call sheet.

01

Noise on the Track

Engine drone bleeds into dialogue and the quiet moments on stage. The usual fix is more distance and more cable, and the sound team still fights it all day.

02

Exhaust in the Crowd

Diesel exhaust drifts into video village, catering, talent trailers, and festival crowds. Talent, crew, and audiences breathe it from load-in to wrap.

03

Refuel Mid-Show

A fuel truck has to reach the generator during the run of the show. Miss it and you lose power with a full crew or an audience waiting.

What Changes

Park It Close.
Keep Rolling.

Nomad systems make power from the sun with no engine running. Hybrid units and the Tow store it in onboard battery for evening calls, so you place power nearer the work and skip the fuel truck.

01

No Engine Noise

No engine running means no engine drone for the sound mixer to fight. Place power nearer set, stage, or the broadcast truck and run less cable.

02

No Exhaust

Nothing burning beside video village, the talent trailers, or the front-of-house tent. Crew, talent, and audiences get power without the fumes.

03

No Refuel Calls

The Box 10 Hybrid carries 61 kWh of battery and the Tow 20 kWh, storing the day's sun for evening calls and night work. No fuel run between setups.

04

Load In, Load Out

The Tow hitches to a suitable tow vehicle and typically deploys in 30 minutes. The Box 10 typically deploys in under an hour with two operators, then folds up for the next location.

Recommended Systems

The Right Platform
For Events & Film.

Defense Exercise Nomad Energy Box 10 deployed with its solar array
10-foot · Expeditionary · Power or Hybrid

Nomad Energy Box 10

A 10-foot container with 61 kWh of Hybrid battery and a 50 kW inverter for base camps, broadcast compounds, and multi-day shoots.

Nomad Energy Box 10 specifications by version
VersionSolarBatteryInverter
Hybrid23.8kWp61kWh50kW
Power47.6kWpNone50kW
Towable Nomad Energy Tow trailer with panels unfolding
Towable Trailer · Typical 30-Minute Deploy

Nomad Energy Tow

A 3,300 lb trailer for company moves and smaller locations: 12 kWp of solar, 20 kWh of battery, and a typical 30-minute setup.

12kWpSolar
20kWhBattery
30minTypical Setup
How to Buy

Buy It. Lease It.
Rent It.

Option 01

Purchase

Own the system outright. Built for permanent sites, long programs, and fleets.

Option 02

Lease

Spread the cost across a fixed term and keep capital free for the mission.

Option 03

Rent

Short-term power for a project, exercise, event, or emergency.

Every brief covers
  • Pricing for purchase, lease & rent
  • Transport & site logistics
  • Supply-chain origin
  • Warranty & U.S. service
  • Lead time to deploy
How buying works
Questions

Straight
Answers.

Is it quiet enough to run near set?

There is no engine, so there is no engine noise, and you can place it nearer the work than a diesel generator. Send us the location layout and your brief plans placement and cable runs.

Will it last through a night shoot?

The Box 10 Hybrid and the Tow carry onboard battery charged by the day's sun. How long they run after dark depends on your load, so we size it from your lighting and equipment list in the brief. The Box 10 Power version has no battery and pairs with a generator or storage.

Can we rent it for a single production?

Yes. Every platform is available to rent, lease, or purchase, so you can rent for one shoot or one festival run, or lease for a season of shows. Rental terms and pricing come in your brief.

How does it get to the location?

The Box 10 travels by truck and is set by crane or forklift. The Tow hitches to a suitable tow vehicle. Typical setup is 30 minutes for the Tow and under an hour for the Box 10 with two operators.

Can it run with our existing generator package?

The Box 10 Power version is solar only and pairs with external generators or storage, so they burn less fuel. Your brief lays out the mix for your show and checks the fit with the generator package you carry.

Request a Brief

Send the Call Sheet.
We'll Power the Day.

Tell us the location, the dates, and the power list. Your brief covers pricing to rent, lease, or buy, transport and placement, and lead time, typically within one business day.

  1. 01Engineering review of your load and site.
  2. 02System match with pricing to purchase, lease, or rent.
  3. 03A clear path to deploy.

HQDallas, TX
Request Brief