Nomad Energy Box 20
20-Foot Solar Power Plant

The most solar we put in a standard 20-foot ISO container. Choose Power for 107.1 kWp that pairs with the generators or storage you already run, or Hybrid for 79 kWp and 122 kWh onboard for power after dark.

Nomad Energy Box 20 containers staged in a row
Nomad Energy Box 20 · 20-foot ISO Container · Power or Hybrid
107.1kWp Max Solar / Power
122kWh Battery / Hybrid
100kW Inverter / Both Versions
Two Versions

Power or Hybrid
Pick by the Night Load

Both versions ship in the same 20-foot container with 100 kW of inverter capacity. The difference is the battery. Power carries the most solar and works with equipment you own. Hybrid carries its own storage.

Hybrid

Solar + onboard battery

Choose Hybrid when the site needs power after dark without an engine running. You get 79 kWp of solar, 122 kWh of onboard battery, and 2 x 50 kW hybrid inverters.

Solar array
132 × 595 W panels
Solar capacity
78.54 kWp
Battery
122.88 kWh (2 × 61.44 kWh)
Inverters
2 × 50 kW hybrid
Typical deploy
Under 3 hours
Request Hybrid Spec Sheet

Power

Solar only. Pairs with generators or storage

Choose Power when you already run generators or storage and want them to burn less fuel through the day. You get 107.1 kWp of solar and a 100 kW inverter (110 kVA max), with no battery.

Solar array
180 × 595 W panels
Solar capacity
107.1 kWp
Battery
None. Pairs with external generators or storage
Inverter
100 kW (110 kVA max)
Typical deploy
Under 3 hours
Request Power Spec Sheet
Highlights

What the Box 20
Changes on Site

01

Cut Generator Fuel Burn

Pair the Power version with the generators or storage you already run. Solar takes part of the daytime load, so the generators burn less fuel. With no battery of its own, it always runs alongside them.

02

Power After Dark

Hybrid stores daytime solar in 122 kWh of onboard battery, so the site keeps running after sunset with no engine running. We size it to your load in the brief.

03

No Civil Works

Pre-wired, factory-configured, and factory-tested inside a standard 20-foot ISO container. No trenching, no foundations, no civil works. It lands, unfolds, and connects.

04

Moves With the Job

When the job ends, the array folds back into the container and leaves by truck for the next site. Built for heat, rain, dust, and salt air. No engine to service.

Deployment

From Truck
to Power

  1. 01

    Truck to Site

    The Box 20 travels as a standard 20-foot ISO container on a truck. Your brief covers the transport plan and site logistics for your location.

  2. 02

    Set It Down

    A crane or forklift places the container. There is no trenching, no foundation, and no civil work to finish before it arrives.

  3. 03

    Unfold the Array

    The solar array unfolds from the container. It arrives pre-wired and factory-tested, so the crew deploys it instead of building it.

  4. 04

    Connect and Run

    Connect your loads to the Hybrid, or tie the Power version into the generators or storage you already run. Plug-and-play from there.

Typical deploy for the Box 20 is under 3 hours from arrival to power, depending on the site.

Questions

Straight
Answers.

What is the difference between Power and Hybrid?

Power is solar only: 107.1 kWp, a 100 kW inverter (110 kVA max), and no battery. Hybrid is solar plus storage: 79 kWp, 122 kWh of onboard battery, and 2 x 50 kW hybrid inverters. Both ship in the same 20-foot ISO container.

Does it run at night?

Hybrid does, from its 122 kWh onboard battery. How long depends on your load, which we size in your brief. Power does not run at night on its own: it has no battery and is built to work alongside your generators or storage.

Can it pair with the generators we already own?

The Power version is built for exactly that. Solar takes part of the daytime load, so your generators burn less fuel. Tell us what you run today in your request, and the engineering review shows how the Box 20 fits.

How does it get on site, and what site work does it need?

It is a standard 20-foot ISO container. It moves by truck and is handled by crane or forklift. It needs no trenching, no foundations, and no civil works. Your brief covers transport and site logistics for your location.

How long does setup take?

Typical deploy is under 3 hours from arrival to power. The system arrives pre-wired, factory-configured, and factory-tested, so the work on site is placing, unfolding, and connecting. Your brief lays out the plan for your site.

Can we rent or lease it, and what is in the brief?

Yes. Every platform is available to purchase, lease, or rent. Your brief prices all three and covers transport and site logistics, supply-chain origin, warranty and U.S. service, and lead time to deploy, with an engineering review typically within one business day.

Request a Brief

Get the Box 20
Spec Sheet and Pricing

Tell us the site, the load, and the generators you run today. Your brief covers pricing to buy, lease, or rent, plus transport, warranty, and lead time, with an engineering review typically within one business day.

  1. 01Engineering review of your load and site.
  2. 02System match with pricing to purchase, lease, or rent.
  3. 03A clear path to deploy.